Share Stormwater Master Plan Implementation on FacebookShare Stormwater Master Plan Implementation on X (formerly Twitter)Share Stormwater Master Plan Implementation on LinkedinEmail Stormwater Master Plan Implementation link
The 2015 Stormwater Master Plan identified 15 priority drainage basins and launched one of the most significant infrastructure investments in the Village’s history.
The Stormwater Master Plan takes time, funding, and coordination across multiple levels of government. Progress means cleaner street runoff, fewer standing-water events after heavy summer rains, and infrastructure built to last.
Your stormwater utility fee, paid with your taxes, funds this work.
Funding the Work
Your Stormwater Utility Fee
Federal and State Grants
Congressional Funding
Every property in Pinecrest contributes a stormwater utility fee, collected with property taxes. That revenue funds the design, construction and permitting of the 15 basin projects.
The Village secured grants from the U.S. Environmental Protection Agency and the Florida Department of Environmental Protection to fund drainage improvements for Basin 1. This cross-government collaboration reduces the burden on local taxpayers.
U.S. Rep. María Elvira Salazar secured $750,000 in federal funds for Pinecrest’s drainage infrastructure through the 2026 Consolidated Appropriations Act. In 2024, Rep. Salazar and Pinecrest’s federal lobbyists secured $1M for stormwater drainage. These investments target flood mitigation and long-term community resilience.
Program at a Glance
Storm Drains
French Drain
Basin 13
Basin 2
Basin 1
Dozens installed since plan adoption
Hundreds of feet installed since plan adoption
Complete
Under construction now
Next major phase
How it Works
The stormwater system uses a network of inlets, French drains and basins, and in some cases outfalls to canals, to move water off streets rapidly during South Florida’s heavy summer rains.
The goal: eliminate repetitive standing-water areas and clean runoff before it reaches canals.
The 2015 Stormwater Master Plan identified 15 priority drainage basins and launched one of the most significant infrastructure investments in the Village’s history.
The Stormwater Master Plan takes time, funding, and coordination across multiple levels of government. Progress means cleaner street runoff, fewer standing-water events after heavy summer rains, and infrastructure built to last.
Your stormwater utility fee, paid with your taxes, funds this work.
Funding the Work
Your Stormwater Utility Fee
Federal and State Grants
Congressional Funding
Every property in Pinecrest contributes a stormwater utility fee, collected with property taxes. That revenue funds the design, construction and permitting of the 15 basin projects.
The Village secured grants from the U.S. Environmental Protection Agency and the Florida Department of Environmental Protection to fund drainage improvements for Basin 1. This cross-government collaboration reduces the burden on local taxpayers.
U.S. Rep. María Elvira Salazar secured $750,000 in federal funds for Pinecrest’s drainage infrastructure through the 2026 Consolidated Appropriations Act. In 2024, Rep. Salazar and Pinecrest’s federal lobbyists secured $1M for stormwater drainage. These investments target flood mitigation and long-term community resilience.
Program at a Glance
Storm Drains
French Drain
Basin 13
Basin 2
Basin 1
Dozens installed since plan adoption
Hundreds of feet installed since plan adoption
Complete
Under construction now
Next major phase
How it Works
The stormwater system uses a network of inlets, French drains and basins, and in some cases outfalls to canals, to move water off streets rapidly during South Florida’s heavy summer rains.
The goal: eliminate repetitive standing-water areas and clean runoff before it reaches canals.
Share Community Feedback on Drainage Work on FacebookShare Community Feedback on Drainage Work on X (formerly Twitter)Share Community Feedback on Drainage Work on LinkedinEmail Community Feedback on Drainage Work link
Stormwater Master Plan Implementation has finished this stage
Village has installed dozens ofstorm drains and hundreds of feet of French drain.
TBD
Stormwater Master Plan Implementation has finished this stage
EPA and Florida DEP grants secured for Basin 1 drainage improvements.
2024
Stormwater Master Plan Implementation has finished this stage
Basin 13 construction complete.
Fall 2025
Stormwater Master Plan Implementation has finished this stage
Basin 2 construction begins.
February 2026
Stormwater Master Plan Implementation has finished this stage
U.S. Rep. María Elvira Salazar secures $750,000 in federal funds through the 2026 Consolidated Appropriations Act.
2026
Stormwater Master Plan Implementation is currently at this stage
Basin 1 is the next major phase of a long-term effort to keep streets passable during heavy summer downpours, reduce repeat standing-water spots and clean runoff before it reaches local canals.